DN80 Scour Pipe Ductile Iron underground (approx 2. 5m); and
DN150 PVC Sump Drain Pipe (approx 1m).
Design and construction of a 0.85ML concrete or bolted steel clear water storage tank, Associated works for the installation of pipe work for a clear water storage tank including
Earthworks;
Connecting pipe work and cut-ins;
The construction of a table drain (approx 15m);
New additional dosing point for existing hypochlorite dosing system;
Electrical and SCADA Works at the Coleraine site and other associated sites