Design & Construction of a Clearwater Storage Tank and Associated Pipe work at Coleraine
Client:
Wannon Water
Completed:
Sept 2009
Works Completed:
Setting out of works;
Design and Construction of pipework;
Design and construction of a 0.85ML concrete or bolted steel clearwater storage tank;
Associated works for the installation of pipework for a clearwater storage tank including, but not limited to:
Electrical and SCADA Works at the Coleraine site and other associated sites;
Siteworks at Coleraine Basin;